Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

In order to achieve the full potential of the SLA Timer Add-on a few Add-on concepts must be explained.

SLA

 

Schedule

 

Overdue - Issue overdue

An issue is considered overdue if the SLA Percent is greather or equals to 100 %.

Target Time

The Target Time or the SLA Target Time is the maximum time which can be spent on a issue.

The SLA Target Time is configured at Add-on configuration pages. A SLA Target Time can be configured for each SLA.

Time Spent

Time Spent is the amount of time an issue has been in scope of a SLA. Spent Time is only increasing when also with the Schedule configured with a SLA.

 

SLA Status

The SLA Status is determined automatically by the Add-on. It describes the state of an issue in terms of the actually spent time versus the SLA Target Time.

 

  • No labels