A Schedule is paired with a SLA. The Schedule defines when an issue in scope of a SLA will increase the SLA Time Spent.
The Schedule is basically a weekly schedule.
A weekday can be configured to Off or On. If On the duration of the day must also be configured.
Attributes | How |
---|---|
Name | The name of the Schedule. The name is also visible from the the View Issue page, so it is recommend to use short and meaningful names. |
Holidays | Holidays can be enabled or disabled. If Holidays are enabled then holidays will set a day to off if there is a match. E.g. if Friday November 10. 2017 is created as a Holiday then that is considered off, and SLA Time Spent will not increase. |
Days and Hours | Configure which days are off or on. If on, configure the duration of the day. If hours is configured to "between 07:00 and 17:00", the schedule is in schedule when the is equal or greater than 07:00 (7am) and less than 17:00 (5pm). Though the 24:00 (12om) must be configured as 23:59. Meaning 23:59 is the same as 24:00. |
Project Specific | A Scehdule can be specific for a project or can be used by all projects. |
Paired SLAs | Displays the SLAs the Schedule is paired with. |
Operations | A Schedule can be deleted, but only if not paired. |